September 11, 2013

Demolition has begun on the Phase 1 work of the Perelman Plaza project at Drexel University. The work includes the removal of several walkways, curbing, benches and the placement of temporary lawn panels. The main scope of this phase will be the renovation of the Cohen Garden area located between the Peck Alumni Center and Main.

Be sure to check back here for updates.

Blog comments powered by Disqus